Creation of the Hungarian National Dance Theater
Customer
Magyar Nemzeti Táncszínház
Project duration
2017-2022
Location
Budapest
Our partners
Bosch Rexroth, J&C Joel
The Budapest National Dance Theater has moved to a newly renovated building for the Theater in Millenáris Park. During the planning, the special features of the building had to be taken into account. As a highly important production hall of the former Ganz factory, its functionality at the time of construction could not be further from that of a theater. The architects tried to preserve the industrial character of the building, in a new guise. The most modern theater technical machines and equipment had to be fitted into this environment.
Média megjelenések
Grand Hall
-
Main stage curtain drive system 1 set
-
Adjustable-size portal/proscenium masking 1 set
-
Mobile lighting tower 2 units
-
Movable lighting bridge (auditorium) 1 unit
-
Movable lighting bridge (stage) 1 unit
-
Movable lighting pipe (auditorium) 2 units
-
Movable lighting pipe (stage) 3 units
-
Lighting brackets 10 units
-
Scenery hoist (upstage) 2 units
-
Scenery hoist (auditorium) 2 units
-
Scenery hoist (stage) 10 units
-
Forestage speaker / PA lift 1 unit
-
Auditorium speaker / PA lift 1 unit
-
Panorama / cyclorama bars 8 units
-
Movable backdrop 1 unit
-
Motorized opera foil / scrim 1 unit
-
Projector lift (upstage) 1 unit
-
Mobile point hoist 20 units
-
Fixed Bosch Rexroth stage machinery control console 1 unit
-
Mobile Bosch Rexroth stage machinery control console 1 unit
-
Master Mover electric tractor / tugger 2 units
-
Hydraulic lift 2 units
Small Hall
-
Front curtain / main curtain 1 set
-
Scenery hoist 10 units
-
Lighting pipe above stage 3 units
-
Lighting pipe above auditorium 1 unit
-
Mobile Bosch Rexroth stage machinery control console 1 unit
-
Curtain support structure 10 units
-
Backdrop support structure 1 unit
Foyer
-
Truss-based curtain support structure 1 set













